New construction of cinema complex in Utrecht.

Description

Cinema with 14 screens, 3,300 seats and a surface area of 14,500 m² with a 2,000 m² food court.

 

Timing

Date subscription 10-07-2015
Executed by 60% Van Laere 40% Strabag Belgium
Start 19-10-2015
Delivery 23-12-2016

Technical description

Pile foundation (with soil displacement), foundation blocks, beams and cast concrete (hollow core and wide slab floors).
Steel skeleton with hollow core and wide slab floors. Acoustic cover for the hollow core floors in the auditoriums.
Concrete facade elements connected to profiled steel facade plates. Curtain wall at the entrance and in the food court area. Steel roof plates (technical area)
Acoustic plasterboard walls in the auditoriums + standard MS walls in the common areas. Wooden seats in the auditoriums. Suspended ceilings in the auditoriums, offices and sanitary areas.
Steel strings with wooden treads. Railings with wooden finish.

Building physical data

Total surface16.500 m²
Number of levels4
Excavations5.600 m³
Concrete2.500 m³
Reinforcement110 tonnes
Vaulting & TT elements20.000 m²
Steel1.600 tonnes
Atlas screw piles380 pieces
Formwork3.500 m²
Brickwork11.500 m³
Roof cladding5.900 m²
Acoustic decoupling1.700 m