This green field will be referred to as IPV-GSK project WN201. The facility will have a total surface of approx. 15.000 m², spread over three levels. The building will be placed west of the WN158, across the AQ/QC road and the new administrative building in Wavre.
Timing
Date order | 05-12-2011 |
Date subscription | 02-09-2011 |
Executed by | 50% Alg. Aann. Van Laere nv 50% Valens |
Start | 19-12-2011 |
Delivery | 31-12-2012 |
Technical description
Site arrangement (tower crane, excavations, slopes, etc.)Foundations and concrete works
Placing prefab concrete, steel components
Placing drainage, rainwater discharge.
Placing prefab concrete, steel components
Placing drainage, rainwater discharge.
Building physical data
Total surface: | 15.000 m² |
Offices: | 8.900 m² |
Excavation: | 1.500 m³ |
Concrete: | 20.425 m³ |
Reinforcement: | 1.120 ton |
Vaulting and TT elements: | 9.312 m² |
steel: | 1.270 tonnes |
Formwork: | 22.632 m² |
Roof cladding: | 5.320 m² |