Central Gate
Brussel
Renovation of an existing office building with two underground levels and 7 levels above the ground floor. Mainly replacing the water sealing and exterior woodwork, adapting the evacuation airlocks and staircases and renovating technical elements.
Builder | Befimmo s.c.a. |
Architect | LD2 |
Study team | VK Engineering |
Delivery year | 2012 |