Description
Concrete study. Building of a signal box building and a service building ready for immediate occupation, including infrastructure.
Timing
Date order | 14-11-2007 |
Date subscription | 15-03-2007 |
Executed by | 100% Alg. Aann. Van Laere nv |
Start | 02-04-2008 |
Delivery | 16-12-2010 |
Technical description
Groundwork: | 2.000 m³ (diverse classifications) |
Floors in vaulting: | 1.600 m² |
Central building with pile foundation: | 200 pieces |
Grid of pile heads and foundation beams on which floor slabs are cast: 300 m³
Above-ground constructions: beams, pillars, walls and floor slabs (600 m³), load-bearing brickwork (460 m³), insulation and parament (2.000 m²).
Roof construction: partly concrete (450 m²), partly metal rafters and chipboard (400 m²), insulating sloping concrete, waterproofing based on reinforced bitumen with EPDM Steel outside staircase / outside wall covering in zinc Exterior carpentry in aluminium and steel including awning
Above-ground constructions: beams, pillars, walls and floor slabs (600 m³), load-bearing brickwork (460 m³), insulation and parament (2.000 m²).
Roof construction: partly concrete (450 m²), partly metal rafters and chipboard (400 m²), insulating sloping concrete, waterproofing based on reinforced bitumen with EPDM Steel outside staircase / outside wall covering in zinc Exterior carpentry in aluminium and steel including awning
Building physical data
Ground floor: | 770 m² |
Floors 1 - 2 - 3: | 730 m² |
Floor 4: | 340 m² |
Floor 5: | 100 m² |
Building height: | 24 m |
Total: | 1.940 m² |