Description
Carcass, including making it wind and watertight, for the construction of a new fusion hospital in Roeselare as well as a logistics building adjacent to the new hospital.
Timing
Date order | 04-06-2013 |
Date subscription | 05-02-2013 |
Executed by | 50% Alg. Aann. Van Laere nv 50% Jan De Nul |
Start | 06-08-2013 |
Delivery | 17-12-2015 |
Technical description
The hospital building has a crawl space (-2) and half-underground cellar (-1) with a foundation on piles - above that are 5 floors (ground floor to +4 - façade of sandwich elements, concrete columns, steel IFB profiles and prefabricated TT elements for the floor) and a technical floor (+5 - steel structure with steel deck and façade gratings)
Building physical data
Total surface: | 120.000 m² |
Excavation: | 75.000 m³ |
Concrete: | 55.000 m³ |
Reinforcement: | 4.700 tonnes |
Vaulting & TT elements: | 70.000 m² |
Steel: | 3.000 tonnes |
Formwork: | 140.000 m² |
Water sealing layers: | 28.000 m² |
Roof cladding: | 28.000 m² |
Glazing: | 13.000 m² |