Builder:

Befimmo s.c.a.

Architect:

LD2

Study team:

VK Engineering
Central Gate Central Gate Central Gate Central Gate

Central Gate

Brussel

Renovation office building

Description

Renovation of an existing office building with two underground levels and 7 levels above the ground floor. Mainly replacing the water sealing and exterior woodwork, adapting the evacuation airlocks and staircases and renovating technical elements.

Timing

Date order 02-12-2010
Date subscription 17-11-2010
Executed by 100% Alg. Aann. Van Laere nv
Start 17-01-2011
Delivery 31-08-2012

Technical description

2 underground levels with car park.
Ground floor with entrance and commercial areas.
7 office levels above the ground floor.

Building physical data

Lifts:10 pieces
Print sheet