Builder:

Project T&T n.v.

Architect:

Cepezed b.v. - Samyn and Partners bvba

Study team:

SmitWesterman - Ingenieursbureau Meijer bvba
BIM – IBGE BIM – IBGE BIM – IBGE BIM – IBGE

BIM – IBGE

Bruxelles

Office building

Description

New office building with underground parking – a passive BREEAM certified building.

Underground level with parking garage as well as technical and archive areas (2,726 m²). Ground floor and first floor with an auditorium, exposition hall, a laboratory, a multimedia centre and a collective restaurant + 6 additional office floors. A total of 8 above-ground levels.

Timing

Date order 04-06-2012
Date subscription 06-02-2012
Executed by 100% Alg. Aann. Van Laere nv
Start 20-08-2012
Delivery 01-05-2014

Technical description

Foundation on screw piles, footings and concrete slabs. Underground level walls, columns and beams poured on site and precast concrete panels. Above ground steel columns and beams with prestressed vaulting, much concrete remains visible. Façade and majority of the roof are curtain wall structures with mostly glass, aluminium panels with incorporated solar poles. Small portion of the roof with EPDM for technical installations.
RWA for parking and atrium
KWO installation and concrete core active in the compression layers.
Rain water recuperation and water purification.
Finishing with polished compression layers.
Acoustic ceiling islands.

Building physical data

Total surface:19.652 m²
Number of levels:9
Excavation:13.500 m³
Concrete:5.000 m³
Reinforcement:147 + 247 tonnes
Vaulting & TT elements:15.091 m²
Precast concrete panels:3.116 m²
Print sheet