Builder:

Bouygues Immobilier Belgium S.A.

Architect:

A2RC Architects

Study team:

Bureau Van Ransbeek
Arena Arena Arena Arena

Arena

Evere

New-build apartments

Description

This project is a 7 floor apartment building with the possibility for shops and other businesses on the ground floor, a 15 floor skyscraper and 3 levels of underground parking.

Timing

Date order 22-10-2012
Date subscription 20-10-2012
Executed by 100% Alg. Aann. Van Laere nv
Start 26-11-2012
Delivery 26-02-2015

Technical description

The foundation is steel (solid ground), concrete structure with brickwork filler and prefab terraces, wind and watertight due to the exterior aluminium siding and parament brickwork, exterior plastering and wooden façade cladding. Watertight flat roofs. Complete interior finishing of 172 apartments

Building physical data

Total surface:54.700,8 m²
Gross volume:164.162,40 m³
Number of levels:-3 / 0 / +7 / +15
Parking:2.992,3 m²
Concrete:8.900 m³
Reinforcement:754 tonnes
Vaulting & TT elements:4.687,20 m²
Steel:16,43 tonnes
Roof cladding:2.491 m²